Click here to go back to the previous page

 

2019 Proficiency Test (PT) on Migration of elements EN71-3 started

 

The letter of instructions can be downloaded here as a pdf document. To download a document, please click the right mouse button and choose the "save as" option.

 

 Please download the instructions for the PT iis19V02A, cat. 1 here: the letter of instructions and the report form here.

 Please download the instructions for the PT iis19V02B, cat. 2 here: the letter of instructions and the report form here.

 Please download the instructions for the PT iis19V02C, cat. 3 here: the letter of instructions and the report form here.

 

 

Summary of this proficiency test:

 

On 26 March 2019 the proficiency test on Migration of elements EN71-3, cat. 1 started with 37 participants from 16 different countries. Migration of elements EN71-3, cat. 2 started with 39 participants from 18 different countries. Migration of elements EN71-3, cat. 3 started with 95 participants from 29 different countries. On that date, the samples were dispatched to the laboratories.

Please confirm sample receipt as soon as you have received and checked the contents of the sample package via www.kpmd.co.uk/sgs-iis-cts/. Please enter the date of receipt and press the "save date" button.

 

 

The samples can be analyzed on: Al, Sb, As, Ba, B, Cd, Cr, Co, Cu, Pb, Mn, Hg, Ni, Se, Sr, Sn and Zn.

 

The deadline for reporting results is set on 3 May 2019. A laboratory that reports test results after the deadline will definitely not get direct feedback in case any of its results are suspect! So be in good time to get the most out of this proficiency test.

The test results should be reported via our internet based results reporting platform www.kpmd.co.uk/sgs-iis-cts/. A login and a password can be requested via email to iisnl@sgs.com

 

 

 

iis

©1996-2023 Institute for Interlaboratory Studies