Proficiency Test on Lead in Paint started

The report forms can be downloaded (as Word document). To download the forms, please click the right mouse button and choose the "save as" option.  

Download the report forms (iis12V01) of this Proficiency Test on Lead in Paint here: report form

Summary of this proficiency test:

On 16 February 2012 the proficiency test on Lead in Paint started with 111 participants from 33 different countries.

On that date, samples (#12010 and #12011) were dispatched to the laboratories. Enclosed to the samples were the instructions to the participants for this proficiency test, forms for the reporting of the analysis results.

The samples have to be analyzed on Total Lead content.

The deadline for reporting results is set on 14 March 2012. A laboratory that sends in results after deadline will definitely not get direct feedback in case any of its results are suspect! So be in good time to get the most out of this proficiency test.